Cap’n Sams Relocation Project 6/11/2015

On Wednesday, following the dump truck and bulldozer removal, R.E. Goodson made the final opening in the channel that was opened last week. The attached aerial photos show the completed channel.

R.E. Goodson has worked throughout the day to build up the sand stockpiles. After lengthy discussions late this afternoon with Coastal Science and Engineering and R.E. Goodson, SIPOA has been advised that the optimal time to do the closure is this evening during the low tide cycle. The closure attempt will take place during the evening hours and should be completed before sunrise.

 

Heather Paton
SIPOA Executive Director