SIPOA Maintenance Projects

The SIPOA maintenance staff has recently completed two projects.  The picture below shows the new stairs at Boardwalk 8 that were built to replace the stairs that were lost during Irma.

Boardwalk_8

The dog/foot wash station adjacent to the community center pool has also been renovated. The old brick wall that was falling apart has been removed and replaced with an ipe wall.

Dog&fFootWash_CommunityCenterPool

Thanks to Gary, Duaine, and Larry for doing such a great job!

-Submitted by SIPOA on behalf of Steve Hirsch, PE, PMP, Director of Engineering

This entry was posted in Recreation, Seabrook Island, SIPOA. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s